top of page

Squires

Plaza

Type

Professional/

Planning

Time

​Summer 2018 

Location

Blacksburg, VA

“A vibrant crossroads that promote collaboration through additional seating, enhanced landscape planting, and the introduction of public art.”

 

squires plan.png

1. Donaldson-Brown Lawn

2. GLC Patio

3. Stadium Seating

4. Outdoor Seating Area

5. Concrete Pavers

6. Ellipse Brick Walk

7. Bioretention Cell

8. Vegetation Screen

9. Bike Parking

10. ADA Route

11. VT Entry Sign and Kiosk

12. Organic Planting Bed

13. LumenHaus - with 

       pools, seating and

       ADA access ramp

14. Permeable Geometric    

       Concrete Paver

15. Tree Pit with Gravel

16. Vegetation Screen

17. Bike Parking

18. Bioretention Cell

19. Preserved Fountain

20. Seat Wall

21. Concrete Pavers

22. Library Plaza - supports    

       events, emergency and 

       food trucks

23. Event-Focused Seating 

       Area

24. Planting Basin with        

       Seasonal Interest

25. Flower path

26. Seat Wall

27. Bioretention Cell

28. Stairs

29. ADA Route

30. Bike Parking

31. Tree Lined Walk

32. Path - links to Alumni 

       Mall

33. Service Access Area

34. Seat Wall

35. Bike Parking

36. Prairie Bioretention 

       Basin

37. Vegetation Screen

Pages from Squires Plaza Package-0717.pn

Considering the existing streetscape improvements on College Avenue (between Main Street and Otey Street), this project carries a non-obstacle pedestrian promenade along the axis of College Avenue from Otey Street to the Drillfield, the social center of the campus. New public spaces with stormwater improvements and different functionality are created, and will provide more outdoor social and study spaces for the Donaldson-Brown Lawn, Newman Library, and CID Commons planned for the existing bookstore.

rendering 3.jpg
1.png
2.png

© 2019 by Jingyi (Jessy) Qiu. Created with Wix.com

© Copyright
  • Facebook - Grey Circle
  • LinkedIn - Grey Circle
  • Instagram - Grey Circle
bottom of page